Sand-Point Well & Hand Pump Plan
Not a standard off-grid kit. This is the top-of-the-line rebuild of the driven sand-point well - safer by design, with every claim below naming a real feature drawn into the plan itself.
THE BUILD: drive a 1-1/4 in string - 48 in stainless sand point plus 5 ft galvanized sections - to 24 ft in the fully worked example, develop it clear, mount a cast-iron pitcher pump on a 36 in concrete pad, sanitize it, and lab-test it before anyone drinks.
WHAT ORDINARY POUND-AND-PRAY INSTRUCTIONS LEAVE OUT, ALL DRAWN IN: (1) A SUCTION-LIFT CHECK DONE BEFORE YOU SPEND A DOLLAR - the worked example lifts 16 ft against the 25 ft practical pitcher-pump limit (9 ft / 1.56x margin, verified two ways: by depths and by elevations), with a fill-in worksheet that re-derives the lift, depth, and pipe tally for YOUR site and tells you plainly when this design does not fit. (2) A SCREEN PARKED BELOW THE DRY SEASON - the screen finishes 6 ft below static water, so a 4 ft seasonal drop still leaves it 2 ft submerged. (3) JOINT DISCIPLINE YOU CAN PROVE - every driven joint compound-sealed to a bench standard, then validated by an overnight prime-hold test that checks buried joints you can no longer see. (4) A SANITIZE-AND-TEST PROTOCOL, NOT A HOPE - shock chlorination dosed from your state extension table with the well's pipe volume computed two ways (0.064 gal/ft), a full contact time, a 48-hour wait after the chlorine clears, then a certified-lab coliform AND nitrate test before the word drinking is used. (5) SETBACKS TREATED AS STRUCTURE - 100 ft design distance from septic, never under the 50 ft floor, the well placed up-gradient of contamination, local code checked first.
EVERY MEASUREMENT VERIFIED TWO WAYS: pipe chain (4 + 4x5 = 24 ft), lift chain (14 + 2 = 16 ft, and 102.0 - 86.0 = 16.0 ft by elevations), pipe volumes, pad concrete (3.0 cu ft both by inches and by feet = 5 bags), spout clearance (24 in vs a 15 in bucket), and every fastener bite-checked (pump lags bite 1-3/4 in into the post, tips inside) with the pump bearing ON its pad at a computed 59 psf.
BEGINNER-FIRST, IN DEPTH: terms defined at first use (static water level, suction lift, development, shock chlorination), practice first (a bench driven joint, a chalked-tape water-level reading, priming from a barrel), 29 continuously numbered steps, 12 labeled diagrams - one at every technique stage - a stop-and-check after each of the 8 stages, mistake fixes for every stage (including the honest ones: when to pull the string and move, and what a failed lab test actually means), sourcing with a good/better path (stainless point, true drive couplings) and costs labeled estimates, and a final checklist with the well-card record system.
You receive: the PDF plan only (digital download, no physical product ships) with materials list, the depth/lift worksheet, full verification section, and the printed maintenance and re-test routine. Full build plans and material list in the TheWorkshopBlueprint website store at theworkshopblueprint.shop.
