Not a standard off-grid kit. Most micro-hydro write-ups promise watts and let you buy parts first and measure second. This plan reverses that order - and every claim below names a real feature drawn into the plan itself.

WORKSHEET FIRST, BEFORE ANY PURCHASE: Steps 1-7 measure YOUR creek - gross head surveyed twice, low-season flow timed three times, friction subtracted - and compute YOUR watts before a single part is ordered. The worked design point is printed in full: 150 gpm at 25 ft net head = 707 W theoretical, worked two ways (150 x 25 x 0.1885 imperial; 9.46 L/s x 7.62 m x 9.81 metric - they agree), then 389 W delivered at an honest 55% system efficiency, 9.34 kWh/day. If your worksheet reads under 100 W delivered, the plan tells you not to build - in writing, at the first checkpoint.

HONEST EFFICIENCY, PRINTED AS A RANGE: 50-60% water-to-battery, with the losses itemized (runner about 72%, alternator about 82%, controller and wiring about 90%) - never the 80% brochure figure that counts the runner alone.

FOUR MORE FEATURES ORDINARY GUIDES LEAVE OUT: (1) a 4 in penstock sized on real velocity (3.8 ft/s at 150 gpm, two ways) and a friction table at YOUR flow, so net head is head you keep; (2) a 60+ sq in intake screen - 4x the 12.73 sq in pipe area, two ways - on a breakaway flood frame, with a bypass that always passes water downstream; (3) flood and freeze survival designed in - drain-down valve, slow-closing GATE valve (a ball valve on the main run is forbidden, for water hammer), penstock on bearing saddles every 8 ft; (4) a dump load wired and PROVEN before the first wet run to take full output with the battery disconnected, so the runner can never spin free.

INTERMEDIATE-ADVANCED, IN DEPTH: terms defined at first use, practice first (survey, bucket test, PVC joint - all on dry land), 28 continuously numbered steps, 12 labeled diagrams - one at every technique step - a stop-and-check after each stage, mistake fixes with a diagnosis table for under-delivery, cable drop computed two ways (0.97 V / 2.0% at 48 V over 60 ft), a care calendar, sourcing with a good/better path (fabricated vs balanced kit runner), and a final checklist. Pairs with the Solar Power Shed and the Off-Grid Battery & Control Cabinet.

You receive: the PDF plan only (digital download, no physical product ships) with the full worksheet, materials list, and verification sections. Full build plans and material list in the TheWorkshopBlueprint website store at theworkshopblueprint.shop.

Finished size System sized by worksheet: design point 150 gpm at 25 ft net head = 389 W delivered, 9.34 kWh/day; 4 in penstock; runner housing 24 x 18 in
Materials estimate $900-$1,800 (estimate; penstock, runner, PM alternator, hydro diversion controller and dump load - see the plan Sourcing section)
Skill level Intermediate-Advanced