Gravity Filtration & Water Storage Station Plan
Not a standard off-grid kit. This is the top-of-the-line rebuild of the household gravity filter - not a bucket balanced on a counter, but a purpose-built station where every claim names a real feature drawn into the plan itself.
THE BUILD: a 36 x 18 x 60 in rack (stacks verified two ways: 6 + 0.75 + 23.25 + 0.75 + 23.25 + 0.75 + 5.25 = 60.0 in; width 1.5 + 33 + 1.5 = 36 in) holding a 5-gallon raw bucket up top, a two-candle filter vessel in the middle, and two 5-gallon clean containers below - 15 gallons, 125.1 lb of water, verified two ways (15 x 8.34 lb and 3 x 41.7 lb).
FIVE THINGS ORDINARY SETUPS LEAVE OUT, ALL DRAWN IN: (1) A FIXED 24 IN GRAVITY HEAD giving 0.87 psi of drive pressure (24 in x 0.0361 and 2 ft x 0.433 - two ways), so flow is predictable. (2) HONEST CANDLE NUMBERS - 0.7 gal/hr per candle, 1.4 gal/hr for the pair, a 5-gallon batch in about 3.6 hours, 16.8 gal/day on a 12-hour run against a 4 gal/day family need (4.2x margin), element replacement at 600 gal per candle or 6 months, printed on the rotation log. (3) PHYSICAL CLEAN/DIRTY SEPARATION - raw only on top, clean only below, color-coded spigots, so clean water cannot be cross-contaminated by a careless pour. (4) A DATED FIFO ROTATION - containers A and B with fill-date tags and a posted four-line routine the whole household can run. (5) SHELVES WITH REAL MARGIN - top shelf designed for 100 lb against a true 43.7 lb full bucket (2.3x), bottom for 180 lb against 87.4 lb (2.1x), every load on bearing (board ON cleat ON rail), every fastener bite-checked.
HONEST LIMITS, PRINTED UP FRONT: candles reduce sediment, cysts, and most bacteria and improve taste - they do not remove viruses or chemicals, and the plan states plainly when to boil or disinfect instead of pretending otherwise.
BEGINNER-FIRST, IN DEPTH: terms defined at first use, a practice section (spigot on scrap, weighed gallon, test joints) before the real build, 30 continuously numbered steps, 12 labeled diagrams - one at every technique step - a stop-and-check after each stage, mistake fixes, a care calendar, sourcing with a good/better path (plastic vessel vs stainless), and a final checklist.
You receive: the PDF plan only (digital download, no physical product ships) with materials list, cut list, and the full two-way verification section. Full build plans and material list in the TheWorkshopBlueprint website store at theworkshopblueprint.shop.
